Please confirm that some of the approved low-voltage pipes, which are printed to fire at H.I. 0+025.44 (track kilometre 2) on track 1 and track 2 coming from the central platform of the New Railway Station will be used for the hauling of formation cables from the technical signalling room (3.4) towards the tunnel.<br>
Μεταφράζονται, παρακαλώ περιμένετε..
