No reengraving of rails is required where there is no breach of a train gauge from the tunnel or from another construction even if the tunnel has been constructed outside tolerances.<br>After the construction of the tunnel, the tolerance of the construction does not appear in the drawings of the track-engraving nor required as free distance.
Μεταφράζονται, παρακαλώ περιμένετε..