The comments/comments, recorded in the conduct of the factory acceptance tests (FAT) from 2.10.19 to 4.10.19 at the manufacturer's factory (ABB Italy) of ' said ' equipments and involved in the revision of the logical diagrams, where of course required and is imperative, must be taken into account by the contractor.