A) The submission of part of the control and testing operations (common to both types of transformers, as proposed by the manufacturer ' ' MF Transformatori ' ' and refer only to the coil equipment), without any coordination with the project implementation study ( e.g. relay operation of temperature elevation and leakage as to Earth, communication and transfer of signals to the equipment of the 20KV Board, control of system devices of mechanical locking with keys, etc.).