Comments/comments, recorded in the official protocol of the Factory Acceptance (FAT) tests of the 20KV MΤ tables at the manufacturer's Factory (Siemens) in Germany/Frankfurt and conducted from 12.11.19 up to 14.11.19, are required to be checked and taken into account by the contractor in the upcoming construction site testing (PSAT, SAT) of the component "Pylaias".
Μεταφράζονται, παρακαλώ περιμένετε..