We would like to point out the problem that began to be created in the exterior of our building, at K. Papadakis 34, following the work done by the AM for the movement of drainage pipes to the opposite side of the Existed.<br><br>After cutting the substrate of the slabs and the placement of the wells, the consistency of the paved was cut and cracks were presented in the ground, resulting in penetrate the rainwater and precipitation in the soil.<br>The situation is considered urgent, because the deposition is constantly deteriorating, the fence has taken a steep slope and is in danger of falling.<br>Earlier this morning, we informed Mr. Vakalopoulos about the necessary and immediate restoration of paved.<br>Please, as you take care of the matter and inform us of this.
Μεταφράζονται, παρακαλώ περιμένετε..