Finally, it is clarified that on the PM side, where appropriate, representatives of engineers not fully familiar with the design and operation of the equipment concerned and with the completeness of the document; These schematic correlation diagrams shall be included to properly monitor the performance of these tests.<br>
Μεταφράζονται, παρακαλώ περιμένετε..