In order to further optimize the layout, carefully select the electrical contractor"s equipment, choose suitable pipe diameter size according to the existing container, but also effective judgment mechanism change in pipe diameter according to the caller overcome. In addition, it may also have more than one tube, in the reservoir, the number will also be put into operation, will also depend on to overcome to provide. Finally, adhere to the requirements of the installation and maintenance of a necessary condition to ensure the efficiency of the system"s service life.
Μεταφράζονται, παρακαλώ περιμένετε..
