Include in the work of these relevant paragraph enforcement operations of the mechanical locking system with key (mechanical key-interlocking system,) according to the approved Design (ME) between Table MT 20KV Depot "Pilea" and while "upstream ' tables and DEDDHE Y.F.V.I "New Switzerland", and not "downstream '' Lift equipment transformers (2554KVA) and auxiliary functions (100KVA), and tables A, B, C1 & C2, installed in buildings Depot "Pylea".
Μεταφράζονται, παρακαλώ περιμένετε..