It is noted that this system was not available and was not checked during the conduct of the factory acceptance of the MT 20KV table of component "Pylaias" at the "SABO Electric" plant (see observation. No. 4 of the Protocol receiving the table).
Μεταφράζονται, παρακαλώ περιμένετε..