It points out that since the content of your submission relates to different equipment, i.e. those of traction power transformers and those of auxiliary functions, with different operating modes, installation and protection controls in the areas of the rectifier substation (RS), the process of the acceptance of construction tests (PSAT/SAT) is resubmitted for each type of transformer, separately (as independent submissions).