The construction schedule of the station (annexed 1) with completion date 30/11/2026 has as intermediate phases the following:<br>A) Operation of a section of the underground opening of the Venezuelan station, with parallel passage of wires from the underlying tunnel TBM, to the phase allowed to continue the safe and smooth passage of wires.<br>B) Entry into service (July 2023) throughout the line without the presence of the Venezuelan station.<br>Restriction of trade (July 2024) in the section from the station at the station at the station at the station N.<br>Switzerland to complete the quay and the rest of the station construction.<br>