Since the REF620 are destined for regional structural components of the PRCS system for the control and surveillance of the board, adequate justification of their redundancy is required to a minimum of 15% (see § 15.3.1 of the Performance specification T_DP15750), e.g. adding signals.
Μεταφράζονται, παρακαλώ περιμένετε..