Within the logical diagrams of annexes 01, 03 and 05, a large number of errors are detected, which make it difficult to control and comment on them.<br>Indicatively, the following are mentioned:<br>In the memoranda of the tables and equipment, the acronyms and descriptions are inconsistent with those used in the other implementation studies (WITH) of the Thessaloniki Metro's traction power system.<br>The location of the display screens of alarms is unclear.
Μεταφράζονται, παρακαλώ περιμένετε..