Notwithstanding the Undertaking's assurance that the position/ status condition condition condition between the disconnect switch of the Gateway bodywork and the main line DLI is incorporated, and "CB/2" switch, i.e. "in order for CB/2 to close, DLI must be open and in order for DLI to close, CB/2 must be open"; the logical operating diagram (page 11/20) indicates that it is missing.<br>
Μεταφράζονται, παρακαλώ περιμένετε..